Understand / Project survey

Understand the site before installation

ROS are Grease Recovery Unit (GRU) installation specialists. We also install commercial dishwashers and project manage installations ranging from HVAC units to automated beverage systems.

It starts with a site survey

Before proposing an installation, we look at the restaurant as it operates. Our project surveys are offered free of charge and give us the information needed to define a practical scope and keep avoidable costs down.

Examples of the detail included in our survey reports. Client references are anonymised.
01 / SITE

Understand the kitchen

We review sinks, appliances, available space and drainage routes, identify sources of fats, oils and grease (FOG), and plan suitable mitigation and GRU locations around the operation.

02 / RECORD

Measure and photograph

We take measurements and photographs of the areas that matter, including relevant drainage, power supplies and access constraints.

03 / SPECIFY

Identify materials and work

We establish what equipment, materials and supporting work the project may need, and flag any issues to resolve before installation.

04 / PROPOSE

Set out a detailed proposal

The survey findings inform a clear proposed scope and cost. Where appropriate, we consider practical alternatives that can reduce unnecessary work.

Survey outcome

A clear basis for the next step

The result is a recorded understanding of the site and a proposal that can be developed into a design for the installation.

Next stage

From survey to design

See how measurements and survey findings become scaled drawings and an installation specification.

Next: Explore the design stage →

Discuss a project with ROS

Contact Mike Stacey about GRUs, commercial dishwashers or project management: mstacey@rosonline.uk · 0800 151 2224.